Today, the crew built out the deck on the control side, which now has a rise on it to allow the rain water coming off the roof drains of our apartment alongside of the pool to properly drain, a feature that the original design did not have. This feature will help keep the concrete from failiing as it did before, since we have drains in now on three sides.....

The crew also began to frame in the decorative panels and will start putting those up this afternoon, pickets is the actual name. Then, we let the whole thing cure for six weeks, and then Ricky can smother it with weather treatment.
No comments:
Post a Comment