Thursday, February 19, 2009

Pool project at Greenwood is underway!

Perhaps a few days late, but the pool redo on the concrete is well underway, thanks to Tina for providing the picture. They did a nice clean job. This was necessary because the original builder did not build the deck properly, so the lining was sinking at the back side, and had actually broken off. A crew of three laborers came in and broke up the old concrete by hand, with mauls and picks! I was a little surprised at the shallow depth of the liner, but I guess thats all they do. After we get the edging repoured, we are replacing the pool liner, and finally, building a new deck, properly this time. This should be the last of the projects for the Greenwood house.