Wednesday, August 19, 2009

First in bay tomorrow again, no guarantee :-(


At about 2 this afternoon, Rick started to work on our coach again- we have been waiting now for three days for Gulf Stream to give the go-nogo on the repairs. This is even after we spoke with a Gulf Stream factory rep who happened by today, and spoke directly with the warranty dept. We have been emailing back and forth.
Rick finished up the air conditioner this afternoon, where he had to rewire a piece that he inadvertently drilled into yesterday; he got the antenna installed, but Bette isn't happy with the way we did the power source, and the antenna needs to be tuned at a CB shop. Good enough for now. Rick then got the refrigerator annual maintainence done- and we breezed through that. Fridge is in excellent working order.
At this point, we still have no roof leak repair. In frustration, I fired off a rather curt email to Gulf Stream basically demanding that they get off the dime and give us an answer one way or the other by 10 am tomorrow morning, one way or the other. At issue is about 3 to 4 hundred dollars in repairs. I'm taking the stand that the pissing match if there is one needs to be over, and either McClains or GulfStream is going to stand behind the earlier non repairs.
But, we are first in the bay again tomorrow! Hopefully, tomorrow, we get the roof repaired, an answer on the kitchen cabinets, and get the coach washed, and we can be on our way Friday morning to being done??????? Stay tuned.

No comments: